We are building one of Finland’s largest warehouses in Järvenpää

Picture: Picture made for planning purposes of the first phase that will be built.

Construction work on the 18-hectare plot in Järvenpää will start in September 2023 with the groundworks for the first part of the warehouse. The first part will be around 35 000 square meters in size and is expected to be ready for use in spring 2025. The plot, which is equivalent in size to around 13 football pitches, will enable the construction of a warehouse of over 90 000 square meters.

This is a significant investment: the cost of acquiring the land and building the first part of the warehouse will total around EUR 60 million.

"This is great news for our customers and staff. A modern, responsible, and space-efficient warehouse with excellent accessibility is a real competitive advantage. Finland's warehouse stock is relatively old and there is not much environmentally friendly storage space available," says Sakari Kiiskinen, who is heading Transval. 

Better competitiveness through outsourcing warehousing operations

Companies have a growing need for efficient, versatile, and environmentally responsible warehousing services. A logistics partner with sufficient storage capacity, the right number of professionals and the ability to adapt to the company's needs, for example during high season, brings real added value.

"We have the know-how and experience to build the best possible warehouse and its operations. So, it's better for customers to invest in developing their customer relationships rather than in warehousing. As a logistics professional, we can manage warehousing more efficiently and responsibly," says Kiiskinen.

Transval has 320 000 m2 of warehouse space in Finland. The warehouses are certified in accordance with quality, environmental, health and safety (ISO 9001, ISO 14001, ISO 45001). The latest warehouse was completed in Sipoo in 2022.

Responsible warehousing with a good location

Posti, and thus Transval, is committed to the Science Based Target initiative. Posti has an ambitious target to be zero emission in its own emissions by 2030. For the whole value chain, the net zero target is 2040.  

The Järvenpää warehouse will use modern technology and automation. The building will be heated by geothermal solutions and solar energy will be used to generate electricity.

The central location close to the capital region will facilitate logistics and ease commuting. The nearby airport and ports enable fast logistics also outside Finland.

The first phase warehouse will employ an estimated 100 logistics professionals. In total, the staff facilities will be designed for up to 350 employees.

Modern and sustainable warehousing in Järvenpää

Benefits for your business:
  • You can choose from our scalable warehousing services, from small to large, depending on your needs.
  • We provide all the services of the logistics value chain in a flexible and easy way.
  • We help your company to develop a responsible business in many different ways.
  • Our new circular economy initiative will enable you to grow your business through circular economy services.
  • You can choose value-added services for warehousing and transport according to your needs, e.g. warehousing of dangerous goods, Green Freight.
  • As a strategic partner, we develop and improve the efficiency of your business.
  • We provide you with logistics professionals for your business.
  • With the market leader in logistics in Finland, you can focus on growing your business and we take care of the logistics for you.
Find out more about our warehouse in Järvenpää, Finland
  • We aim to achieve BREEAM environmental certification at Excellent level.
  • A geothermal system covers 90% of the heating demand.
  • Solar power covers 10% of electricity consumption.
  • Building automation in the property that uses weather conditions and weather forecasts to optimize energy consumption.
  • Intelligent, motion-sensitive LED lighting.
  • The entire area is fenced and covered by access control and camera surveillance.
  • Bi-netted data transmission.
  • Connectivity to external backup power.
  • Total surface area of the first phase of over 35 000 m2, including almost 4 000 m2 of loft space.
  • The full extent is over 95 000 m2.
  • Over 70 000 pallet places in the first phase. Full capacity of over 210 000 pallet places.
  • Forklift trucks equipped with energy-efficient li-ion batteries.

Picture: Picture made for planning purposes of the first phase that will be built.

Järvenpää Transval 1 1200 x840

transval ota yhteyttä

Interested?

Contact directly Jari Immonen, Vice President, Sales, tel. +358 400 499125 or jari.immonen@posti.com.

Contact information for the media:
Posti MediaDesk, Tel. +358 (0)20 452 3366
Mon-Fri at 9-16 EET